ground mounted turbine

This installation is at Maryport Visitors Centre in Cumbria.

Ground mounted turbine

A single ground mounted turbine installation usually takes a full day to complete from arrival on site to electrical commissioning.

qr facts

Key factors when assessing sites:

  • Is there sufficient wind to install a wind turbine?
  • Will the turbine maintain its performance in turbulent environments?
  • Turbines that ‘yaw’ may suffer with frequent changes in wind direction;
  • Is the turbine safe to be located next to the public?
  • Will it disturb neighbours through noise or vibration?
  • Aesthetics – will people like or oppose it?